Extreme Heavy Duty Construction Adhesive

LN-907

  • bvseo_sdk, net_sdk, 3.2.0.0
  • CLOUD, getAggregateRating, 82ms
  • REVIEWS, PRODUCT
  • bvseo-msg: The resource to the URL or file is currently unavailable.;

Key Features

  • Bonds in Extreme Temperatures
  • 2X Stronger Than Fasteners Alone
  • All Weather, All Season Performance
  • BONDS WIDE RANGE OF SUBSTRATES

Details: 

LIQUID NAILS® Extreme Heavy Duty Construction Adhesive (LN-907) offers outstanding adhesion, durability and performance in extreme conditions, bonding in temperatures from 22° F to 120° F. All weather, all season performance helps get the job done right in any condition. Certified by UL Environment to meet the GREENGUARD Gold Standard as a low emitting material.

Sizes:

10 oz. Cartridge
28 oz. Cartridge

Coverage:

30 Lineal ft. Using 1/4" Bead

Specifications:

ASTM C-557

Available at:

The Home Depot
Lowes
Menards
Walmart
True Value

Details: 

LIQUID NAILS® Extreme Heavy Duty Construction Adhesive (LN-907) offers outstanding adhesion, durability and performance in extreme conditions, bonding in temperatures from 22° F to 120° F. All weather, all season performance helps get the job done right in any condition. Certified by UL Environment to meet the GREENGUARD Gold Standard as a low emitting material.

Sizes:

10 oz. Cartridge
28 oz. Cartridge

Coverage:

30 Lineal ft. Using 1/4" Bead

Specifications:

ASTM C-557

Available at:

The Home Depot
Lowes
Menards
Walmart
True Value

Application Tips

Application Instructions: 

Preparation: Surfaces must be clean, dry and structurally sound. Paneling must be conditioned per manufacturers instructions. Research all installation instructions and read label for safety, health, and environmental information. Place in caulk gun, cut nozzle, and puncture inner seal with nail or wire. Cabinets and Countertops: Apply ¼" bead to contact areas. Press into place. Mechanical fasteners must also be used for wall cabinets.

Furring Strips or Studs: Apply ¼" zigzag bead to each strip or stud. Press into place. Use nails at top and bottom.

Drywall: Apply ¼" zigzag bead to each stud. Press drywall into place. Position panels so that edges meet at stud center. Nail as required.

Subfloors: Apply ¼" bead to joists. Press subflooring into place and nail or screw every six inches around panel perimeter and every 12" into joists in field of the panel.

MSDS / Technical Information

Tech Data

English (US)

Certificate of Conformity

English (US)

Sell sheets

LN-907-English-US

Reviews & Questions

Reviews and Ratings
Questions and Answers
  • bvseo_sdk, net_sdk, 3.2.0.0
  • CLOUD, getReviews, 0ms
  • REVIEWS, PRODUCT
  • bvseo-msg: The resource to the URL or file is currently unavailable.;
  • bvseo_sdk, net_sdk, 3.2.0.0
  • CLOUD, getContent, 0ms
  • REVIEWS, PRODUCT
  • bvseo-msg: The resource to the URL or file is currently unavailable.;